Controlled manufacturing from design finalisation to shipment.
Urban Suiting combines product development with controlled batch manufacturing so approvals, quality and delivery remain visible throughout the process.
10
Practical production stages
1–2 wks
Typical sample development
4–6 wks
Typical bulk production
PRODUCTION PROCESS
Ten practical stages. One controlled route.
The exact sequence can adapt to the product, but every order is built around approvals, repeatability and quality control.
01
Design Finalisation
Review the brief, design intent, market, quantities, price target and construction requirements.
02
Pattern Making
Translate the approved design into accurate production templates and establish fit consistency.
03
Raw Material Selection
Select leather, textiles, linings, insulation, trims and hardware around performance, appearance and price.
04
Cutting
Cut materials according to approved patterns and production specifications.
05
Decoration
Apply logos, embroidery, appliqué, printing, embossing, patches and branded elements.
06
Stitching
Assemble garment components using the appropriate construction, thread and seam specifications.
07
Finishing
Complete zippers, buttons, washes, wax treatments, pressing and other finishing operations.
08
Quality Control
Review materials, dimensions, construction, workmanship and product consistency.
09
Packaging
Pack garments to buyer requirements including barcode labels and custom retail preparation.
10
Shipping
Coordinate export preparation, customs documentation and air or sea freight support.
QUALITY BUILT INTO THE ROUTE
APPROVAL POINTS
Approval points reduce surprises later.
Sample approval, material confirmation, in-line inspection and final quality control are intended to keep fit, construction, workmanship and presentation aligned with the agreed product standard.
01
Sample approval
Bulk production begins after the relevant design, material and construction details have been approved.
02
In-line control
Checks during manufacturing help catch construction or workmanship issues before final assembly.
03
Final inspection
Finished garments are reviewed before packing to verify agreed dimensions, workmanship and presentation.
TYPICAL PLANNING WINDOWS
Clear timelines begin with complete information.
Lead times vary by product, materials and approval speed, but a complete brief helps the team plan the route more accurately.